Under Construction

Madhabi Tower

Life at the heart of a park

Uposhohor, Rajshahi

Starting from · all-inclusive৳ 48.5 lakh
Bedrooms
3
Bathrooms
2
Size
1,150 sq ft
Storeys
6
Total Units
12
Handover
June 2028

Thoughtfully planned around the daily life of a family—parents, two children and visiting guests. Surrounded by greenery, with a generous courtyard at its centre.

Key Features

  • A step-free bedroom suited to elderly parents
  • Separate formal drawing room and family living area
  • Full generator backup and two passenger lifts
  • Underground water reservoir
  • Gas connection (subject to government approval)
  • Rooftop garden and children’s play courtyard

Amenities

  • Rooftop garden
  • Children’s play courtyard
  • Full generator backup
  • Two passenger lifts
  • CCTV and 24-hour security
  • Car parking
  • Community hall

Floor Plans

Typical Floor Plan
Typical Floor Plan1,150 sq ft

Units & Pricing

UnitFloorSizeBedroomsPriceStatus
3A3rd1,150 sq ft3৳ 48,50,000Available
3B3rd1,100 sq ft3৳ 46,50,000Available
4A4th1,150 sq ft3৳ 49,50,000Booked
4B4th1,200 sq ft3৳ 51,00,000Available
5A5th1,150 sq ft3৳ 50,50,000Available

Payment Plan

Apartment price৳ 42,00,000

Registration and taxes৳ 3,50,000

Utility connections and generator৳ 3,00,000

Total৳ 48,50,000

  1. 1
    Booking depositPayable on signing the booking letter
    ৳ 3,00,000
  2. 2
    Down paymentWithin 30 days of booking
    ৳ 6,70,000
  3. 3
    36 monthly instalmentsDue by the 10th of each month
    ৳ 1,08,000

If you choose home financing, we assist with processing your documents through our partner banks.

Construction Specifications

Structure
BNBC 2020 compliant, seismic zone 2Independently verified by a third-party engineering firm
Reinforcement steel
Grade 500WMill test certificate for every consignment
Concrete
4,000 psi28-day cylinder test at an accredited laboratory
Soil investigation
6 boreholesPile design based on the investigation report
Lifts
Two 8-person passenger liftsInternational brand with a 2-year service warranty
Fire safety
Fire alarm, hydrants and two staircasesSubject to Fire Service clearance

Documents & Approvals

  • Land title deedRegistered sale deed and khatian
    Verified
  • Mutation and land development taxDCR and up-to-date tax receipts
    Verified
  • Building plan approvalRAJUK / City Corporation
    View
  • Environmental and fire safety clearanceObtained prior to construction
    In progress

Construction Progress

46%As of October 2026
  1. FoundationJune 2026
  2. SuperstructureSeptember 2026
  3. Roof castingNovember 2026
  4. Masonry and finishesMarch 2027
  5. Utility connectionsSeptember 2027
  6. HandoverJune 2028

Next milestone: Sixth-floor roof slab casting · November 2026

1 October 2026Fifth-floor slab casting completed
1 September 2026External brickwork commenced
1 August 2026Fourth-floor structure completed

In the Neighbourhood

  • Schools and colleges5 min by car
  • Medical College Hospital12 min by car
  • Bus terminal10 min by car
  • Railway station18 min by car
  • Market4 min by car
  • Mosque2 min by car